Consultancy Services for Preparation of Engineering Plan & Detailed Structural Design & Supervision for Construction of 4 lane Flyover under the Project Construction of East-West Link Road starting from Rajshahi-Naogaon main Road to Mohanpur at RajshahiNator Road in Rajshahi City. Contract Signing Date: 16th September 2015 | Consulting Services for Design and Supervision of Construction of 20 Storied Commercial (Multifunctional) cum Residential Building named as City Shapla Plaza & 25 Storied Commercial cum Residential Building named as City Padda Plaza in Narayanganj City Corporation. Contract Signing Date: 27th December 2015 |
Design and construction supervision consultancy services for both end approach road and 1km long Bridge over KaptaiLake connecting Bagachari to Naniarchor Bridge, RANGAMATI. Contract Signing Date: 16th May 2016 | Design and supervision Consultancy Services for Development of 19 Park and 12 Playground. Contract Signing Date: 3rd August 2016 |
Project 1 Consultancy Services for Construction of Modern Slaughter House at Hazaribagh and Kaptan Bazar. Project 2 Consultancy Services for Improvement of traffic management infrastructure (Intersection, Bus-Stoppages/ Bus-Bay, Left Lane, Guard Rail, Traffic Sign, Grill, Fencing etc.) Contract Signing Date: 3rd August 2016 | Hydrological and Morphological Study of 15 Bridges over Different River at Dhaka, Gopalganj, Rajbari, Kushtia, Shariatpur, Khulna, Bagerhat, Barishal, Patuakhali, and Jhalokhati Districts under LGED. Contract Signing Date: 21th September 2017 |
Preparation and submission of a High Quality Environment Friendly Master Plan for the “BEPZA Economic Zone” Contract Signing Date:1st November 2017 | Consultancy Services for Feasibility Study and Detail Design for Construction of Janalihut-CUET-Kaptai Dual Gauge Railway Link of Bangladesh Railway Chittagong. Contract Signing Date: 13th February 2018 |
“Construction of 02-Nos Slipway each 2000 M. T. (Max) with winch, wheel house, slipway machineries, steel gangway jetty with RCC abutment including driving of 4 Nos Spud, removing & cleaning the mud/clay/sandy deposit from river bed by dredging & manual earth cutting of surrounding area with all other incidental works & full time supervision for successful completion of the relevant works at Dockyard no 1 & 2 of BIWTC, Narayangonj” Contract Signing Date:30 September 2019 | Consultancy Services for Contract Signing Date: |